SUIVI FINANCIER MAISON EN PAILLE FAMILLE PABOEUF – 23600 TOULX SAINTE CROIX |
|
|
|
|
|
|
| N° |
Date |
Tiers |
Notes |
Montant |
|
|
|
|
|
| Toiture / Isolation |
|
|
|
|
|
30/07/09 |
bricot depot |
10 chevrons 63*75*3000 (pour osb) |
-52.5000 |
|
16/10/09 |
VALBOIS SCIERIE |
chevrons |
-92.4500 |
|
30/07/09 |
bricot depot |
ISOLATION : 15 dalles osb 14mm |
-74.8500 |
|
12/06/09 |
bricot depot |
ISOLATION : 80 dalles OSB 14mm |
-399.2000 |
|
12/06/09 |
bricot depot |
TOITURE : 2 ecran toiture 1*50m |
-115.8000 |
|
11/07/09 |
bricot depot |
TOITURE : 2 raccords velux edw co2 |
-83.7200 |
|
11/07/09 |
bricot depot |
TOITURE : 2 velux ggl co2 3076 |
-383.4400 |
|
07/08/09 |
gedimat |
TOITURE : Tuiles |
-3103.5000 |
|
|
|
|
-4305.4600 |
|
|
|
|
|
| SDB |
|
|
|
|
|
26/11/09 |
brico depot |
1 vidange baignoire |
-16.9000 |
|
26/11/09 |
brico depot |
CARRELAGE MURAL : 1 colle pate mur |
-8.9900 |
|
26/11/09 |
brico depot |
CARRELAGE MURAL : 11 frise orange |
-29.7000 |
|
26/11/09 |
brico depot |
CARRELAGE MURAL : 11 frise vert |
-29.7000 |
|
16/10/09 |
brico depot |
CARRELAGE MURAL : 12 mortier colle |
-79.0800 |
|
16/10/09 |
brico depot |
CARRELAGE MURAL : 2 sachets 100pieces 4mm croix carrelage |
-3.6000 |
|
26/11/09 |
brico depot |
CARRELAGE MURAL : 3m² carrelage mural 20*20 blanc |
-29.8500 |
|
26/11/09 |
brico depot |
CARRELAGE MURAL : joint blanc |
-6.9000 |
|
19/11/09 |
brico depot |
MEUBLE : 1 caisson meuble sdb b80 |
-42.0000 |
|
03/12/09 |
brico depot |
MEUBLE : 1 façade 1p 70*40 |
-34.0000 |
|
03/12/09 |
brico depot |
MEUBLE : 2 paires charnières |
-8.0000 |
|
26/11/09 |
brico depot |
SANITAIRE : 1 baignoire 140*70 |
-77.8900 |
|
26/11/09 |
brico depot |
SANITAIRE : 1 ens douche |
-22.0000 |
|
19/11/09 |
brico depot |
SANITAIRE : 1 mitigeur evier |
-34.0000 |
|
26/11/09 |
brico depot |
SANITAIRE : 1 mitigeur thermo baignoire |
-60.0000 |
|
19/11/09 |
brico depot |
SANITAIRE : 1 mélangeur lavabo |
-10.4500 |
|
26/11/09 |
brico depot |
SANITAIRE : 1 porte baignoire |
-30.0000 |
|
|
|
|
-523.0600 |
|
|
|
|
|
| quincaillerie |
|
|
|
|
|
26/11/09 |
brico depot |
1 brosse a rechampir |
-2.5000 |
|
12/11/09 |
brico depot |
1 lot 2 cartouche + pistolet neoprene |
-6.9000 |
|
10/12/09 |
brico depot |
1 petit sachet visserie |
-1.5000 |
|
26/11/09 |
brico depot |
1 pinceau plat |
-4.6000 |
|
10/12/09 |
brico depot |
1 rouleau peinture 100mm |
-2.7700 |
|
26/11/09 |
brico depot |
1 superglue |
-12.2000 |
|
23/05/09 |
bricot depot |
ESSAI / Non servi : 10 chevilles a frapper 8*80 |
-8.4000 |
|
23/05/09 |
bricot depot |
OSSATURE BOIS : 2 *5kg pointe 5*125 |
-17.8000 |
|
23/05/09 |
bricot depot |
OSSATURE BOIS : 3 *5kg pointes 5*110 |
-26.7000 |
|
07/07/09 |
bricot depot |
OSSATURE BOIS : 5kg pointes 3*70 |
-8.9000 |
|
07/07/09 |
bricot depot |
OSSATURE BOIS : 5kg pointes 5,5*140 |
-8.9000 |
|
23/05/09 |
bricot depot |
OSSATURE BOIS : 8 equerres mixtes renforcées |
-14.0800 |
|
03/06/09 |
bricot depot |
OSSATURE BOIS : 8 plaques perforées |
-10.8000 |
|
23/07/09 |
bricot depot |
OSSATURE BOIS : pointes 5kg 5*125 |
-8.9000 |
|
07/07/09 |
bricot depot |
OSSATURE BOIS : vises placo3,2*45 2kg |
-8.3000 |
|
03/06/09 |
bricot depot |
OSSATURE BOIS :1 sachet visserie |
-9.3500 |
|
26/11/09 |
brico depot |
PLANCHER : 500 visses placo 3,5*45 |
-7.0200 |
|
17/08/09 |
bricot depot |
TOITURE : 3 baches |
-17.8500 |
|
29/06/09 |
pasquet |
TOITURE : 1 paquet 25kg pointes |
-8.0000 |
|
11/07/09 |
bricot depot |
TOITURE : 2 paquets 1060 agrafes 53-12mm |
-9.4600 |
|
03/09/09 |
bricot depot |
TOITURE : 50 visses 6*70 pour tuiles |
-5.7900 |
|
16/07/09 |
brico depot |
TOITURE : 500visses 4,5*45 |
-29.9800 |
|
11/07/09 |
bricot depot |
TOITURE : clou/visses |
-7.0000 |
|
11/07/09 |
weldom |
TOITURE : pointes |
-16.1000 |
|
16/07/09 |
brico depot |
TOITURE : pointes 5kg 2,4*50 |
-8.9000 |
|
27/08/09 |
bricot depot |
TOITURE : visses |
-5.5500 |
|
21/08/09 |
weldom |
TOITURE : visses aglo 4*50 pour tuiles |
-9.9000 |
|
23/07/09 |
bricot depot |
TOITURE ISOLATION : 500visses (pour osb) 4,5*45 |
-14.9900 |
|
08/09/09 |
pasquet |
TOITURE ISOLATION : pointes 5kg |
-8.6700 |
|
03/09/09 |
bricot depot |
TOITURE ISOLATION : visses |
-1.6500 |
|
17/08/09 |
bricot depot |
TOITURE VISSES : 1 sachet visserie |
-3.4000 |
|
10/12/09 |
brico depot |
TRAITEMENT BOIS : 2 siccatif |
-5.7600 |
|
10/12/09 |
brico depot |
TRAITEMENT DU BOIS : 1 cire antiquaire 1litre |
-10.9500 |
|
10/12/09 |
brico depot |
TRAITEMENT DU BOIS : 1litre essence terebentine |
-3.3900 |
|
10/12/09 |
brico depot |
TRAITEMENT DU BOIS : 2*5litres huile de lin |
-31.0800 |
|
10/12/09 |
brico depot |
TRAITEMENT DU BOIS : 25 feuilles silex fin |
-2.9500 |
|
19/11/09 |
brico depot |
TRAITEMENT DU BOIS : huiles parquet (AVOIR : ramené et remboursé) |
-24.5000 |
|
27/10/09 |
bricot depot |
TRAITEMENT DU BOIS : lasure 2,5l incolore à eau |
-6.9000 |
|
|
|
|
-392.3900 |
|
|
|
|
|
| portes et fenetres |
|
|
|
|
|
12/11/09 |
brico depot |
2 mastics huisseries |
-10.6600 |
|
15/10/09 |
brico depot |
colle bois 750gr |
-7.8500 |
|
17/09/09 |
LAPEYRE |
HUISSERIE : ACCOMPTE 50% |
-625.0000 |
|
09/10/09 |
LAPEYRE |
HUISSERIE solde |
-625.0000 |
|
15/10/09 |
brico depot |
POIGNEES : 2 poignées portes fer forgées |
-29.0000 |
|
26/11/09 |
mr bricolage |
POIGNEES portes |
-25.4000 |
|
|
|
|
-1322.9100 |
|
|
|
|
|
| Plomberie brute |
|
|
|
|
|
07/12/09 |
weldom |
|
-28.4600 |
|
05/12/09 |
weldom |
|
-29.9100 |
|
09/10/09 |
weldom |
|
-17.6700 |
|
19/11/09 |
brico depot |
1 chauffe eau gaz butane 11litres |
-239.0000 |
|
10/12/09 |
brico depot |
1 detendeur but 2,6kg |
-25.8500 |
|
10/12/09 |
brico depot |
1 manchon 100mm |
-3.3200 |
|
26/11/09 |
brico depot |
1 raccord 16f15*21 |
-3.8000 |
|
05/12/09 |
weldom |
1 raccord ecrou 15*21 d16 sac de 5 |
-26.3000 |
|
10/12/09 |
brico depot |
1 reducteur pression ff 15/21 |
-24.7000 |
|
26/11/09 |
brico depot |
1 robinet detendeur but 1,3kg (remb erreur) |
-38.1500 |
|
26/11/09 |
brico depot |
1 robinet detendeur but 2,6 kg |
-43.8400 |
|
19/11/09 |
brico depot |
1 siphon mal sortie |
-3.8000 |
|
12/11/09 |
brico depot |
1 te pour per d25 |
-3.5000 |
|
19/11/09 |
brico depot |
1 te87 mf d40 |
-1.6000 |
|
03/12/09 |
brico depot |
1 tube evacuation gaz chauffe eau 118/125 |
-8.7500 |
|
19/11/09 |
brico depot |
10 colliers pour pvc d40 |
-5.3500 |
|
19/11/09 |
brico depot |
2 coudes à visses f 15*21 |
-3.6000 |
|
19/11/09 |
brico depot |
2 flexibles 30cm ff 15*21 |
-6.8000 |
|
03/12/09 |
brico depot |
2 flexibles but/propane 1,5 / 10 ans |
-35.8000 |
|
13/11/09 |
brico depot |
2 manchons laiton d25 |
-12.3000 |
|
10/12/09 |
brico depot |
2 raccords per d16 15/21 |
-8.6000 |
|
19/11/09 |
brico depot |
2 reduction chrome 15*21 12*17 |
-3.0500 |
|
03/12/09 |
brico depot |
2 reductions m20*27 f15*21 |
-3.6800 |
|
26/11/09 |
brico depot |
2 silicone blanc sanitaire |
-3.9800 |
|
05/12/09 |
weldom |
2 tampon reduction mf d93*40*40 |
-13.2000 |
|
19/11/09 |
brico depot |
2 tubes 2metres d40 pvc |
-5.7000 |
|
26/11/09 |
brico depot |
3 raccords mal 20*150 d12 |
-10.2600 |
|
03/12/09 |
brico depot |
3 silicone |
-15.9900 |
|
19/11/09 |
brico depot |
3 te 20*27 per 16 et 20 |
-35.8500 |
|
19/11/09 |
brico depot |
4 coudes 87 ff d40 |
-2.4000 |
|
26/11/09 |
brico depot |
4 joints butane/propane |
-1.6400 |
|
26/11/09 |
brico depot |
4 raccords femelle 20*150 d12 |
-12.2400 |
|
19/11/09 |
brico depot |
4 raccords perd16 15*21 |
-17.2000 |
|
03/12/09 |
brico depot |
4 te 15*21 pour per d16 |
-42.0000 |
|
09/12/09 |
weldom |
87 30 ff d40 |
-3.2400 |
|
09/12/09 |
weldom |
coude 87 30 mf d40 |
-1.3600 |
|
13/05/09 |
bricot depot |
evacuation eaux usées sous dalle |
-97.3500 |
|
16/07/09 |
brico depot |
evacuation sous dalle : per d16 bleu 25m |
-21.0500 |
|
16/07/09 |
brico depot |
evacuation sous dalle : per d16 rouge 25m |
-21.0500 |
|
05/12/09 |
weldom |
kit etancheité eau pot + filasse |
-9.4000 |
|
13/11/09 |
weldom |
RACCORD PER |
-7.7500 |
|
09/12/09 |
weldom |
reduction mf d40/32 |
-1.5400 |
|
|
|
|
-901.0300 |
|
|
|
|
|
| Plancher bois étage |
|
|
|
|
|
22/10/09 |
mr bricolage |
60m² plancher pin lande 14cm |
-639.7000 |
|
|
|
|
-639.7000 |
|
|
|
|
|
| Paille / mûr |
|
|
|
|
|
03/09/09 |
bricot depot |
1 bobine fils fer galvanisé : fixer paille angle |
-7.9500 |
|
23/07/09 |
bricot depot |
100 rondelles (tiges filetées) d6,5 |
-8.1500 |
|
27/08/09 |
bricot depot |
2 boites ecrous 10*100 (pour tiges filetées) |
-10.9400 |
|
17/08/09 |
bricot depot |
2 boites de 25 manchons tiges filetées 10*12 |
-19.7800 |
|
27/08/09 |
bricot depot |
25 équerres de chaise |
-5.3000 |
|
27/08/09 |
bricot depot |
3 boites de 25 manchons 10*12 |
-29.6700 |
|
17/08/09 |
bricot depot |
30 tiges filetées 10*1m |
-32.1000 |
|
03/09/09 |
bricot depot |
35 tiges filetées 10*1ml |
-37.4500 |
|
01/09/09 |
GAMME VERT |
4 tiges filetées |
-5.5000 |
|
03/06/09 |
bricot depot |
4 tiges filetées 16*1ml |
-12.4000 |
|
27/08/09 |
bricot depot |
60 tiges filetées 10*1ml |
-64.2000 |
|
03/09/09 |
bricot depot |
ecrou 10*100 pour tiges filetées |
-5.4700 |
|
26/05/09 |
bricot depot |
TIGE FILETES LAMES VISSERIES |
-27.0700 |
|
|
|
|
-265.9800 |
|
|
|
|
|
| Outillage |
|
|
|
|
|
11/07/09 |
bricot depot |
1 brosse metallique |
-9.0500 |
|
12/06/09 |
bricot depot |
1 bâche ultra lourde |
-57.2000 |
|
03/06/09 |
bricot depot |
1 foret metaux17mm |
-17.1000 |
|
07/07/09 |
bricot depot |
1 lame scie sauteuse |
-4.3000 |
|
03/06/09 |
bricot depot |
1 lot 12 crayons menuisier |
-1.5000 |
|
23/05/09 |
bricot depot |
1 manche de masse 4kg |
-14.1100 |
|
12/11/09 |
brico depot |
1 manche raclette pour joint carrelage |
-1.6000 |
|
30/07/09 |
bricot depot |
1 pelle |
-3.9900 |
|
12/06/09 |
bricot depot |
1 perceuse percution ss fil |
-159.9000 |
|
23/07/09 |
bricot depot |
1 plateau nylon d115mm |
-3.8000 |
|
27/10/09 |
bricot depot |
1 ponceuse bande 800w |
-34.9000 |
|
12/11/09 |
brico depot |
1 raclette sol |
-4.7500 |
|
27/10/09 |
bricot depot |
1 écrou nylon pour ponçeuse |
-2.7000 |
|
13/11/09 |
brico depot |
10 disques ponceuse d125 |
-6.7500 |
|
27/08/09 |
bricot depot |
13 forets |
-2.2000 |
|
23/07/09 |
bricot depot |
2 meules plates d115mm |
-5.7000 |
|
23/07/09 |
bricot depot |
3 disques 115*22-36 |
-4.5000 |
|
12/11/09 |
brico depot |
3 disques meuleuse 115*22-36 |
-4.5000 |
|
03/12/09 |
brico depot |
72 baguettes soudure |
-21.3700 |
|
27/10/09 |
bricot depot |
bande grain120 pour ponceuse |
-6.6000 |
|
27/10/09 |
bricot depot |
bande grain50 ponceuse |
-6.6000 |
|
13/05/09 |
bricot depot |
regle de maçon |
-15.9000 |
|
|
|
|
-389.0200 |
|
|
|
|
|
| Ossature Bois |
|
|
|
|
|
03/07/09 |
Retrait ESPECES |
Bois : croutes et chevrons ? |
-250.0000 |
|
28/03/09 |
VALBOIS SCIERIE |
BOIS ACCOMPTE |
-1050.0000 |
|
13/05/09 |
VALBOIS SCIERIE |
BOIS SOLDE |
-2440.5000 |
|
|
|
|
-3740.5000 |
|
|
|
|
|
| Habillage mûr |
|
|
|
|
|
26/11/09 |
brico depot |
2 plaques ba13 hydro 1200*2500 |
-30.5000 |
|
26/11/09 |
brico depot |
3 plaques ba13 |
-22.8000 |
|
26/11/09 |
brico depot |
OSSATURE BA13 demi chevrons 38*63*3000 |
-34.2000 |
|
|
|
|
-87.5000 |
|
|
|
|
|
| Fondation + sous bassement |
|
|
|
|
|
24/04/09 |
bricot depot |
10 ciments 25kg |
-36.0000 |
|
04/05/09 |
bricot depot |
10 ciments 25kg |
-36.0000 |
|
22/04/09 |
bricot depot |
10 ciments 25kg |
-38.0000 |
|
04/05/09 |
Livret A Cedric |
10 CIMENTS 25kg |
-36.0000 |
|
17/08/09 |
bricot depot |
2 mortier colle (sceller tiges filetées) |
-13.1800 |
|
14/04/09 |
bricot depot |
6 ciments 25 kg |
-21.6000 |
|
13/05/09 |
bricot depot |
60 MONOMUR 30*19*29 + 10 ciments 25kg |
-153.0000 |
|
26/05/09 |
GADET FIOUL |
sable fondation |
-128.2800 |
|
|
|
|
-462.0600 |
|
|
|
|
|
| ESCALIER |
|
|
|
|
|
26/11/09 |
brico depot |
1 ensemble escalier droit sapin 299,00 |
-299.0000 |
|
26/11/09 |
brico depot |
1 rampes rainurée 2,5 |
-19.5000 |
|
26/11/09 |
brico depot |
1 traverses sapin 2,5 |
-12.8000 |
|
26/11/09 |
brico depot |
15 balustres 18*50 |
-38.2500 |
|
26/11/09 |
brico depot |
2 poteaux sapin 1,18 |
-27.8000 |
|
|
|
|
-397.3500 |
|
|
|
|
|
| enduits |
|
|
|
|
|
06/10/09 |
pasquet |
5 sac 35kg chaux st astier |
-67.9300 |
|
|
|
|
-67.9300 |
|
|
|
|
|
| Electricité |
|
|
|
|
|
16/10/09 |
brico depot |
1 douille 22mm |
-2.9000 |
|
15/10/09 |
brico depot |
10 boites placo |
-5.6500 |
|
19/11/09 |
brico depot |
100 cavaliers d10 |
-2.5000 |
|
19/11/09 |
brico depot |
100ml cable ptt (relié four à pain à maison) |
-31.8000 |
|
19/11/09 |
brico depot |
100ml fils 6mm² bleu |
-56.9000 |
|
19/11/09 |
brico depot |
100ml fils 6mm² jaune/vert |
-56.9000 |
|
19/11/09 |
brico depot |
100ml fils 6mm² rouge |
-56.9000 |
|
27/10/09 |
bricot depot |
100ml fils ro2v 3g2 5mm² |
-59.9000 |
|
15/10/09 |
brico depot |
15 prises monobloc |
-36.7500 |
|
19/11/09 |
brico depot |
2 *25metres gaines electrique rouge (relié maison au four à pain) |
-26.2000 |
|
27/10/09 |
bricot depot |
2 interrupteurs doubles |
-9.7000 |
|
15/10/09 |
brico depot |
3 barettes conexion 10mm² (domino) |
-3.7500 |
|
03/12/09 |
brico depot |
4 douilles |
-7.2000 |
|
15/10/09 |
brico depot |
6 douilles e27 |
-10.8000 |
|
27/10/09 |
bricot depot |
6 poussoirs monobloc |
-17.7000 |
|
15/10/09 |
brico depot |
8 boites à sceller |
-2.0000 |
|
16/07/09 |
brico depot |
fils bleu 6mm² - 100ml |
-56.9000 |
|
16/07/09 |
brico depot |
fils rouge 6mm² - 100ml |
-56.9000 |
|
16/07/09 |
brico depot |
gaine d20 100ml |
-14.5100 |
|
16/07/09 |
brico depot |
gaine prefilée 100ml |
-79.9000 |
|
|
|
|
-595.7600 |
|
|
|
|
|
| Dalle |
|
|
|
|
|
13/05/09 |
bricot depot |
20 polystirene 1200*600*30 |
-38.0000 |
|
20/05/09 |
bricot depot |
21 treillis soudés 1200*2400 |
-198.9000 |
|
30/07/09 |
bricot depot |
30 ciments 35kg |
-205.5000 |
|
06/08/09 |
bricot depot |
40 ciments 35kg |
-274.0000 |
|
18/09/09 |
gedimat |
gravillon 10,5tonnes |
-215.7800 |
|
16/07/09 |
brico depot |
regles dalle : cornières alu 2,5m 25*25 |
-31.6000 |
|
18/09/09 |
gedimat |
sable rivière 12,5tonnes |
-337.8800 |
|
18/09/09 |
gedimat |
tout venant 4,2tonnes |
-61.7400 |
|
18/09/09 |
gedimat |
transport |
-74.4900 |
|
18/09/09 |
gedimat |
tva |
-135.2200 |
|
|
|
|
-1573.1100 |
|
|
|
|
|
| Cuisine |
|
|
|
|
|
03/12/09 |
brico depot |
1 caisson 100 |
-58.0000 |
|
26/11/09 |
brico depot |
1 caisson bas 40 |
-32.0000 |
|
19/11/09 |
brico depot |
1 caisson cuisine sous evier b120 |
-55.0000 |
|
19/11/09 |
brico depot |
1 caisson cuisine sur hotte |
-19.0000 |
|
19/11/09 |
brico depot |
1 evier 2 bacs sable |
-62.0000 |
|
19/11/09 |
brico depot |
1 façade cuisine 1p |
-54.0000 |
|
03/12/09 |
brico depot |
1 façade cuisine 1p 40 |
-54.0000 |
|
19/11/09 |
brico depot |
1 façade cuisine 3t casserolier 60 |
-79.0000 |
|
19/11/09 |
brico depot |
1 façade cuisine hotte |
-46.0000 |
|
10/12/09 |
brico depot |
1 melaminé adh sienne |
-39.0000 |
|
19/11/09 |
brico depot |
1 profilé alu plan travail raccord |
-14.4600 |
|
19/11/09 |
brico depot |
1 tiroire 600m |
-34.0000 |
|
19/11/09 |
brico depot |
1 tiroire cuisine 40 |
-14.0000 |
|
19/11/09 |
brico depot |
2 façades cuisine 1p1pt 60 |
-150.0000 |
|
19/11/09 |
brico depot |
2 plans travail hetre massif 263 |
-190.0000 |
|
19/11/09 |
brico depot |
2 plinthes cuisine 2,4 |
-80.0000 |
|
10/12/09 |
brico depot |
2 profilé alu plan travail raccord |
-25.8000 |
|
19/11/09 |
brico depot |
2 tiroires coffres 600m |
-78.0000 |
|
19/11/09 |
brico depot |
3 caissons cuisine b60 |
-111.0000 |
|
19/11/09 |
brico depot |
4 façades cuisine 1p1pt |
-256.0000 |
|
19/11/09 |
brico depot |
8 paires charnières |
-32.0000 |
|
07/12/09 |
mr bricolage |
CUISINES MITIGEURS ET RACCORD |
-54.5000 |
|
|
|
|
-1537.7600 |
|
|
|
|
|
| cloison SDB |
|
|
|
|
|
23/10/09 |
bricot depot |
1 porte prépeinte 73d |
-21.7000 |
|
23/10/09 |
bricot depot |
2 sacs colle platre 25kg |
-18.7000 |
|
23/10/09 |
bricot depot |
22 carreaux platre hydro 600*500*50 |
-77.0000 |
|
23/10/09 |
bricot depot |
250 clips lambris bois |
-4.3000 |
|
23/10/09 |
bricot depot |
4 paquets lambris 9*115 |
-62.6000 |
|
23/10/09 |
bricot depot |
500 visses 3,5*45 |
-7.0200 |
|
23/10/09 |
bricot depot |
8 demi chevrons 38*63*3000 |
-22.8000 |
|
23/10/09 |
bricot depot |
bois brut |
-2.3500 |
|
|
|
|
-216.4700 |
|
|
|
|
|
| cloison |
|
|
|
|
|
19/11/09 |
brico depot |
4 paquets lambris 9*115 |
-62.6000 |
|
|
|
|
-62.6000 |
|
|
|
|
|
| Chauffage |
|
|
|
|
|
16/10/09 |
brico depot |
1 chapeau inox d150 |
-32.0000 |
|
16/10/09 |
brico depot |
1 manchon acier galva d125 |
-2.6000 |
|
13/11/09 |
brico depot |
1 reduction conique 130m/153f |
-27.3900 |
|
12/06/09 |
bricot depot |
13 boisseaux 25*25*33 |
-175.5000 |
|
12/06/09 |
bricot depot |
2 mortier refractaire 25kg |
-28.3000 |
|
16/10/09 |
brico depot |
2 paneaux isolants cheminée 1000*600*30 |
-12.1000 |
|
07/07/09 |
bricot depot |
isolation panneau cheminée 1000*600*30 |
-12.1000 |
|
16/10/09 |
brico depot |
tubage polylisse inox 6metres |
-131.4000 |
|
|
|
|
-421.3900 |
|
|
|
|
|
| Carrelage sol RDC |
|
|
|
|
|
12/11/09 |
brico depot |
1 sac ciment joint gris 25kg |
-15.9000 |
|
27/10/09 |
bricot depot |
1 sac joint carrelage gris 25kg |
-15.9000 |
|
16/10/09 |
brico depot |
carrelage sol rdc tomettes |
-741.2000 |
|
16/10/09 |
brico depot |
carrelage sol SDB blanc cassé vielli |
-115.6800 |
|
16/10/09 |
brico depot |
carrelage sol SDB frises |
-33.2000 |
|
|
|
|
-921.8800 |
|
|
|
|
|
| Aménagements intérieurs |
|
|
|
|
|
10/12/09 |
brico depot |
1 kit tringle noir fer 2metres |
-9.9000 |
|
10/12/09 |
brico depot |
1 peinture ardoise 0,5litres |
-11.9000 |
|
10/12/09 |
brico depot |
1 peinture magnetique 0,5 litre |
-19.9000 |
|
10/12/09 |
brico depot |
5 kit tringles noir fer 1,5 metres |
-35.2500 |
|
|
|
|
-76.9500 |
|
|
|
|
|
| TOTAL 1 (travaux sans avoir divers) |
|
|
|
18 900,81 |
|
|
|
|
|
| Travaux avoir (erreur remboursée) |
|
|
|
|
|
03/12/09 |
brico depot |
avoir bricot depot |
+ 102.5000 |
|
10/12/09 |
brico depot |
avoir bricot depot |
+ 81.9900 |
| Total Travaux avoir |
|
|
|
+184.4900 |
|
|
|
|
|
| Total 1 – AVOIR DIVERS |
|
|
18900,81-184,49 |
-18 716,32 |
|
|
|
|
|
| Cadeaux maison |
|
|
|
|
|
19/11/09 |
MAMAN ERIKA |
CUISINE |
800.0000 |
|
|
|
|
|
|
|
|
|
|
| Total général |
|
|
|
- 17 916.32
|